Monday, July 25, 2011

kitchen day one

kitchen day one by sashinka-uk

the kitchen has arrived:) this is day one, pre-made oak cupboards fitted... appliances, doors, paint etc to come

the fireplace inserts are in

the fireplace inserts are in by sashinka-uk

The fireplace inserts are finally fitted. This one is inside the fire suround that was already in the house (I'm guessing 1911) in the dining room, the other one is an eBay bargain, in the lounge. The hall one, red, I bought the fireplace and surround on eBay together, for like nothing.

kitchen being fitted

kitchen being fitted by sashinka-uk

kitchen has arrived - being fitted as I type...

Friday, July 22, 2011

dimity big bedroom

dimity big bedroom by sashinka-uk

Well, we finally have some final-colour-not-undercoat paint.... dimity in the front bedroom. It looks really good with the fireplace....

Monday, July 18, 2011

en suite floor, shower

en suite floor, shower by sashinka-uk

walk in shower

en-suite tiles

en-suite tiles by sashinka-uk

Bathroom tiling in the walk-in shower...

dining room floor (unsanded)

dining room floor (unsanded) by sashinka-uk

Floor's laid, back in two weeks to sand and seal...

Thursday, July 14, 2011

laying the floor

laying the floor by sashinka-uk

We have (the first stage) of a reclaimed oak parquet floor.. yet to be sanded and sealed but layed in the old-fashioned craftsman way (and super speedy) by Jim and his team.