Bus Stop Update: semi-success
Well, after eighten months of to-ing and fro-ing, I have a result: within six weeks, my bus shelter will be replaced with a non-advertising shelter, that is only a two bay, rather than three bay. 24/7 (the company formerly known as London Electricity) just powered my existing bus shelter, even though they had a works order 12 weeks ago telling them not to bother.
Also, we are going to consultation with Camden and Brent about: putting the bus stop back where it came from. Having spent an hour reviewing photos of existing stops, talking with the local Councillor about local people's needs, looking at the spacing of the stops, it turns out it was pretty much fine where it was. So, consultation may take six months (minimum), but I could have acheived something. That something being the previously existing status quo, but hey.